Architectural Ledger
Guest
person

Project Kanban Board

Zoom:
To Do 6

Build campaign landing pages

Med

Design and develop 3 landing pages for different audience segments with tracking pixels and form integrations.

event Apr 05
A

Set up analytics and tracking

Med

Integrate Google Analytics 4, set up conversion goals, and configure event tracking for key user actions.

event Apr 15
B

Push notification integration

Med

Integrate Firebase Cloud Messaging for push notifications on both iOS and Android platforms.

event Apr 05
B

Accessibility audit and fixes

High

Run WCAG 2.1 AA compliance audit and fix all identified issues including color contrast, ARIA labels, and keyboard navigation.

event Apr 20

App store submission prep

Low

Prepare app store listings, screenshots, privacy policy, and review guidelines compliance for both stores.

event Apr 30

Set up UTM tracking and dashboards

Low

Configure UTM parameters for all campaign links and create a reporting dashboard in Google Data Studio.

event Apr 10
D
In Progress 5

Implement authentication flow

High

Build login, registration, and password reset screens with JWT token management and secure storage.

event Mar 15
A

Design email drip campaign

High

Create a 5-email nurture sequence with copy, subject lines, and A/B test variants for each stage.

event Mar 28
D

Migrate content to new CMS

Med

Transfer all existing blog posts, case studies, and product pages to the new content management system.

event Apr 01
C

Build dashboard screen

Med

Create the main dashboard with summary cards, recent activity feed, and quick action buttons.

event Mar 25
D

Social media content calendar

Med

Plan 8 weeks of social media posts across LinkedIn, Twitter, and Instagram with visuals and copy.

event Apr 01
C
Testing 3

Performance optimization

Med

Optimize page load times: lazy loading images, minifying CSS/JS, and implementing CDN caching.

event Apr 10
A

Offline mode support

Low

Implement local data caching and sync mechanism so the app works without network connectivity.

event Apr 15
D

Coordinate influencer partnerships

Low

Identify and reach out to 5-10 industry influencers for sponsored content collaborations during Q2.

event Apr 20
Done 4
Completed

Design new homepage wireframes

Create wireframes for the redesigned homepage including hero section, feature highlights, and testimonials.

check_circle Done
A
Completed

Set up React Native project

Initialize the React Native project with TypeScript, configure ESLint, Prettier, and set up the folder structure.

check_circle Done
B
Completed

Define target audience personas

Research and document 3-4 detailed buyer personas including demographics, pain points, and preferred channels.

check_circle Done
C
Completed

Implement responsive navigation

Build the new responsive navbar with hamburger menu for mobile and dropdown menus for desktop.

check_circle Done
B
science Test Application Site