Project Kanban Board
Set up analytics and tracking
Integrate Google Analytics 4, set up conversion goals, and configure event tracking for key user actions.
Accessibility audit and fixes
Run WCAG 2.1 AA compliance audit and fix all identified issues including color contrast, ARIA labels, and keyboard navigation.
Migrate content to new CMS
Transfer all existing blog posts, case studies, and product pages to the new content management system.
Performance optimization
Optimize page load times: lazy loading images, minifying CSS/JS, and implementing CDN caching.
Design new homepage wireframes
Create wireframes for the redesigned homepage including hero section, feature highlights, and testimonials.
Implement responsive navigation
Build the new responsive navbar with hamburger menu for mobile and dropdown menus for desktop.
Description
Assignee
Due Date
Update Task
Delete Task?
This action cannot be undone. The task and all its data will be permanently removed.